What done looks like: site prepared so the foundation or slab can be placed. Compaction and stone are set to hold through freeze thaw, and the lot is left ready for the next trade.
Crews work bedrock, clay pockets and cottage roads every day. One call from Huron Shores coordinates the whole job.
We work this out of Huron Shores for Thessalon, Blind River, Iron Bridge, Bruce Mines, Elliot Lake and St. Joseph Island.